ダウンロード数: 424
このアイテムのファイル:
ファイル | 記述 | サイズ | フォーマット | |
---|---|---|---|---|
23G-04_1_21.pdf | 632.74 kB | Adobe PDF | 見る/開く |
タイトル: | Rethink of failure of underground construction- lessons learned from Taiwan |
著者: | Hsiung, B. Sakai, T. |
発行日: | 2011 |
誌名: | Proceeding of TC302 Symposium Osaka 2011 : International Symposium on Backwards Problem in Geotechnical Engineering and Monitoring of Geo-Construction |
開始ページ: | 174 |
終了ページ: | 179 |
論文番号: | 共同研究(一般共同研究)23G-04 |
抄録: | Underground construction is widely adopted in urban area but sometimes the construction might cause severely failure. In this paper, successful interpretation of instrument data is addressed and several examples are demonstrated since geotechnical monitoring is thought to be an effective tool to avoid failure. Further, the failure may also be caused by misinterpretation of responsibilities of parties relating underground construction so responsibilities distribution in site investigation, design, construction and geotechnical monitoring are discussed. It is recommended that adequate data of site investigation shall be provided by the client and shall not leave all responsibilities to the contractor. Well- experienced experts shall be invited to evaluate the quantity and quality of data of site investigation before the project goes to tender. |
記述: | International Symposium on Backwards Problem in Geotechnical Engineering and Monitoring of Geo-Construction, Green Hall, Kensetsu-Koryu-kan, 2011/07/14-15 |
URI: | http://hdl.handle.net/2433/173831 |
出現コレクション: | International Symposium on Backwards Problem in Geotechnical Engineering and Monitoring of Geo-Construction |
このリポジトリに保管されているアイテムはすべて著作権により保護されています。