ダウンロード数: 8271
このアイテムのファイル:
ファイル | 記述 | サイズ | フォーマット | |
---|---|---|---|---|
23G-04_1_06.pdf | 1.2 MB | Adobe PDF | 見る/開く |
完全メタデータレコード
DCフィールド | 値 | 言語 |
---|---|---|
dc.contributor.author | Ishihara, Kenji | en |
dc.date.accessioned | 2013-05-10T04:36:48Z | - |
dc.date.available | 2013-05-10T04:36:48Z | - |
dc.date.issued | 2011 | - |
dc.identifier.uri | http://hdl.handle.net/2433/173846 | - |
dc.description | International Symposium on Backwards Problem in Geotechnical Engineering and Monitoring of Geo-Construction, Green Hall, Kensetsu-Koryu-kan, 2011/07/14-15 | en |
dc.description.abstract | After the collapse of the subway excavation in the Nicoll Highway, extensive in-situ investigations were carried out to identify causes of the accident. The results of detailed studies disclosed that lack of toe-in depth of the diaphragm wall into the stiff competent strata could be one of the causes of the incident. This aspect of the studies is highlighted in this paper. | en |
dc.format.mimetype | application/pdf | - |
dc.language.iso | eng | - |
dc.title | Collapse of Braced Excavation in Singapore | en |
dc.type | article | - |
dc.type.niitype | Article | - |
dc.identifier.jtitle | Proceeding of TC302 Symposium Osaka 2011 : International Symposium on Backwards Problem in Geotechnical Engineering and Monitoring of Geo-Construction | en |
dc.identifier.spage | 35 | - |
dc.identifier.epage | 50 | - |
dc.textversion | publisher | - |
dc.identifier.artnum | 共同研究(一般共同研究)23G-04 | - |
dc.sortkey | 06 | - |
dc.address | Research and Development Initiative, Chuo University | en |
dcterms.accessRights | open access | - |
出現コレクション: | International Symposium on Backwards Problem in Geotechnical Engineering and Monitoring of Geo-Construction |
![](/dspace/image/articlelinker.gif)
このリポジトリに保管されているアイテムはすべて著作権により保護されています。