ダウンロード数: 121
このアイテムのファイル:
ファイル | 記述 | サイズ | フォーマット | |
---|---|---|---|---|
2017SBT_FP4.pdf | 815.23 kB | Adobe PDF | 見る/開く |
タイトル: | Conversion of Diversion Tunnels to Bottom Outlets at Xiaolongdi Dam on Yellow River |
著者: | (Paul) Hsu, Sheng T. |
キーワード: | Xiaolangdi Dam bottom outlet orifice energy dissipation |
発行日: | 2017 |
出版者: | Kyoto University |
誌名: | Proceedings of the 2nd International Workshop on Sediment Bypass Tunnels |
開始ページ: | 1 |
終了ページ: | 6 |
論文番号: | FP4 |
抄録: | During planning stage, Xiaolangdi Dam on the Yellow River faced with a problem of how to convert diversion tunnels to large-scale bottom outlets without causing excessive erosive velocity. A closely-spaced multiple orifice scheme was proposed by Bechtel and implemented in the design. High lights of the scheme and the developing process as well as initial testing and operation of the converted bottom outlets are presented. |
記述: | [2nd International Workshop on Sediment Bypass Tunnels = 第2回排砂バイパストンネルに関する国際ワークショップ] May 9-12, Kyoto-Japan, 2017. 特定研究集会: 29C-01 |
URI: | http://hdl.handle.net/2433/245488 |
関連リンク: | http://hdl.handle.net/2433/235820 |
出現コレクション: | 第2回排砂バイパストンネルに関する国際ワークショップ |
このリポジトリに保管されているアイテムはすべて著作権により保護されています。