dc.contributor.authorNAGAO, Yoshimien
dc.contributor.authorYOSHIKAWA, Kazuhiroen
dc.contributor.alternative長尾, 義三ja
dc.date.accessioned2016-02-23T05:35:30Z-
dc.date.available2016-02-23T05:35:30Z-
dc.date.issued1966-07-01-
dc.identifier.issn00236063-
dc.identifier.urihttp://hdl.handle.net/2433/205582-
dc.description.abstractThis paper is concerned with establishing the mathematical basis of the Critical Path Method-a new tool for planning and scheduling projects. The mathematical model upon which the Critical Path Method is based is a parametric linear program that has the objective of computing the utility of a project as a function of its duration. In order to solve the parametric linear program, primal dual algorithm may effectively be used and be solved efficiently by network flow method. This paper contains also the application of this algorithm to the scheduling of quaywall construction at Pier No. 8E, Port of Kobe.en
dc.format.mimetypeapplication/pdf-
dc.language.isoeng-
dc.publisher京都大学工学部ja
dc.titleStudy on Mathematical Basis of Critical Path Method and its Applicationen
dc.typedepartmental bulletin paper-
dc.type.niitypeDepartmental Bulletin Paper-
dc.identifier.ncidAA00732503-
dc.identifier.jtitleMemoirs of the Faculty of Engineering, Kyoto Universityen
dc.identifier.volume28-
dc.identifier.issue3-
dc.identifier.spage227-
dc.identifier.epage243-
dc.textversionpublisher-
dc.sortkey01-
dc.addressDepartment of Civil Engineeringen
dc.addressDepartment of Civil Engineeringen
dcterms.accessRightsopen access-
出現コレクション:長尾 義三

アイテムの簡略レコードを表示する

Export to RefWorks


出力フォーマット 


このリポジトリに保管されているアイテムはすべて著作権により保護されています。