ダウンロード数: 258

このアイテムのファイル:
ファイル 記述 サイズフォーマット 
j.tust.2016.12.014.pdf1.14 MBAdobe PDF見る/開く
完全メタデータレコード
DCフィールド言語
dc.contributor.authorCui, Yingen
dc.contributor.authorKishida, Kiyoshien
dc.contributor.authorKimura, Makotoen
dc.contributor.alternative岸田, 潔ja
dc.contributor.alternative木村, 亮ja
dc.date.accessioned2017-04-07T00:34:10Z-
dc.date.available2017-04-07T00:34:10Z-
dc.date.issued2017-03-
dc.identifier.issn0886-7798-
dc.identifier.urihttp://hdl.handle.net/2433/219482-
dc.description.abstractLarge settlements of the ground surface, crown and foot of a tunnel have been measured at a construction field that an NATM tunnel has been excavated under shallow overburden and unconsolidated ground conditions. For these settlements, it was assumed that if the settlement at the foot of the tunnel had been prevented, the ground subsidence can be controlled effectively. Based on this idea, Foot Reinforcement Side Pile (FRSP) has been utilized to prevent the ground settlement. It was reported that the FRSP could effectively prevent the settlements of ground surface and tunnel during the construction period. However, the mechanism of how the FRSP prevents the settlements of tunnel and surrounding ground has not been clearly understood. In practice, several parameters of the FRSP, such as the length, the spacing and the diameter of the pile, have been determined through the practical construction works. In this paper, three dimensional trapdoor model experiments and the corresponding numerical analyses, and numerical analyses for the actual tunnel excavation are carried out to examine the effect of FRSP on preventing settlements of ground surface and crown and foot of tunnel, and to discuss its mechanism. As a result, it was observed that the FRSP can prevent settlements of the ground surface and tunnel effectively, and these effects of the FRSP are connected with the distance from the tunnel lining to the slip line. When the FRSP is long enough to cross the shear line, it can exert the effect of the shear reinforcement, load redistribution and internal pressure to prevent the settlements of the tunnel and surrounding ground effectively.en
dc.format.mimetypeapplication/pdf-
dc.language.isoeng-
dc.publisherElsevier BVen
dc.rights© 2017. This manuscript version is made available under the CC-BY-NC-ND 4.0 license http://creativecommons.org/licenses/by-nc-nd/4.0/en
dc.rightsThe full-text file will be made open to the public on 01 March 2019 in accordance with publisher's 'Terms and Conditions for Self-Archiving'.en
dc.rightsこの論文は出版社版でありません。引用の際には出版社版をご確認ご利用ください。ja
dc.rightsThis is not the published version. Please cite only the published version.en
dc.subjectFoot reinforcement side pileen
dc.subjectTunnel excavationen
dc.subjectShallow overburdenen
dc.subjectUnconsolidated grounden
dc.subjectSettlementen
dc.subjectTrapdooren
dc.titlePrevention of the ground subsidence by using the foot reinforcement side pile during the shallow overburden tunnel excavation in unconsolidated grounden
dc.typejournal article-
dc.type.niitypeJournal Article-
dc.identifier.jtitleTunnelling and Underground Space Technologyen
dc.identifier.volume63-
dc.identifier.spage194-
dc.identifier.epage204-
dc.relation.doi10.1016/j.tust.2016.12.014-
dc.textversionauthor-
dcterms.accessRightsopen access-
datacite.date.available2019-03-01-
出現コレクション:学術雑誌掲載論文等

アイテムの簡略レコードを表示する

Export to RefWorks


出力フォーマット 


このリポジトリに保管されているアイテムはすべて著作権により保護されています。