Downloads: 81

Files in This Item:
File Description SizeFormat 
j.tust.2016.12.014.pdf1.14 MBAdobe PDFView/Open
Full metadata record
DC FieldValueLanguage
dc.contributor.authorCui, Yingja
dc.contributor.authorKishida, Kiyoshija
dc.contributor.authorKimura, Makotoja
dc.contributor.alternative岸田, 潔ja
dc.contributor.alternative木村, 亮ja
dc.date.accessioned2017-04-07T00:34:10Z-
dc.date.available2017-04-07T00:34:10Z-
dc.date.issued2017-03ja
dc.identifier.issn0886-7798ja
dc.identifier.urihttp://hdl.handle.net/2433/219482-
dc.description.abstractLarge settlements of the ground surface, crown and foot of a tunnel have been measured at a construction field that an NATM tunnel has been excavated under shallow overburden and unconsolidated ground conditions. For these settlements, it was assumed that if the settlement at the foot of the tunnel had been prevented, the ground subsidence can be controlled effectively. Based on this idea, Foot Reinforcement Side Pile (FRSP) has been utilized to prevent the ground settlement. It was reported that the FRSP could effectively prevent the settlements of ground surface and tunnel during the construction period. However, the mechanism of how the FRSP prevents the settlements of tunnel and surrounding ground has not been clearly understood. In practice, several parameters of the FRSP, such as the length, the spacing and the diameter of the pile, have been determined through the practical construction works. In this paper, three dimensional trapdoor model experiments and the corresponding numerical analyses, and numerical analyses for the actual tunnel excavation are carried out to examine the effect of FRSP on preventing settlements of ground surface and crown and foot of tunnel, and to discuss its mechanism. As a result, it was observed that the FRSP can prevent settlements of the ground surface and tunnel effectively, and these effects of the FRSP are connected with the distance from the tunnel lining to the slip line. When the FRSP is long enough to cross the shear line, it can exert the effect of the shear reinforcement, load redistribution and internal pressure to prevent the settlements of the tunnel and surrounding ground effectively.ja
dc.format.mimetypeapplication/pdfja
dc.language.isoengja
dc.publisherElsevier BVja
dc.rights© 2017. This manuscript version is made available under the CC-BY-NC-ND 4.0 license http://creativecommons.org/licenses/by-nc-nd/4.0/ja
dc.rightsThe full-text file will be made open to the public on 01 March 2019 in accordance with publisher's 'Terms and Conditions for Self-Archiving'.ja
dc.rightsThis is not the published version. Please cite only the published version. この論文は出版社版でありません。引用の際には出版社版をご確認ご利用ください。ja
dc.subjectFoot reinforcement side pileja
dc.subjectTunnel excavationja
dc.subjectShallow overburdenja
dc.subjectUnconsolidated groundja
dc.subjectSettlementja
dc.subjectTrapdoorja
dc.titlePrevention of the ground subsidence by using the foot reinforcement side pile during the shallow overburden tunnel excavation in unconsolidated groundja
dc.type.niitypeJournal Articleja
dc.identifier.jtitleTunnelling and Underground Space Technologyja
dc.identifier.volume63ja
dc.identifier.spage194ja
dc.identifier.epage204ja
dc.relation.doi10.1016/j.tust.2016.12.014ja
dc.textversionauthorja
Appears in Collections:Journal Articles

Show simple item record

Export to RefWorks


Export Format: 


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.