Downloads: 38

Files in This Item:
File Description SizeFormat 
a62a0p03.pdf1.05 MBAdobe PDFView/Open
Title: 平成30年7月豪雨時のダムの洪水調節操作と今後の課題
Other Titles: Dam Operation for Flood Control during Heavy Torrential Rainfall in July 2018 --Challenges and Solutions
Authors: 角, 哲也  KAKEN_name
野原, 大督  kyouindb  KAKEN_id
Author's alias: SUMI, Tetsuya
NOHARA, Daisuke
Keywords: ダム洪水操作
平成30年7月豪雨
異常洪水時防災操作
事前放流
ダム再開発
flood control operation
torrential rainfall in July 2018
emergency spillway gate operation
preliminary release
dam upgrading under operation
Issue Date: Sep-2019
Publisher: 京都大学防災研究所
Journal title: 京都大学防災研究所年報. A = Disaster Prevention Research Institute Annuals. A
Volume: 62
Issue: A
Start page: 13
End page: 19
Abstract: In the torrential rain disaster in July 2018, heavy rain over a long period occurred in a wide area mainly in western Japan which caused severe flooding in various places. There were many catchment basins greatly contributing to reduce the flood water level in the downstream river by the flood control operation of the dam reservoir. Meanwhile, due to prolonged rainfall, the flood control capacity of the dam is expected to be full, and some dams carried out the emergency spillway gate operation at the time of extreme flooding. In this paper, we outline the implementation status of the dam flood control operation in the heavy rain disaster, analyze the effect and problem, and describe the direction of countermeasures for these problems for large-scale flooding in the future.
URL: http://www.dpri.kyoto-u.ac.jp/publications/nenpo/
URI: http://hdl.handle.net/2433/244884
Appears in Collections:Vol.62 A

Show full item record

Export to RefWorks


Export Format: 


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.